About the project
The City of Sacramento has started construction of the first phase of the K Street Streetscape project. The key objectives are to: aesthetically improve the corridor, increase safety, enhance pedestrian lighting, build connectivity, improve pedestrian mobility, and create a safe and inviting public space. The project will include new and consistent paving materials, street furniture, trash receptacles, landscaping, lighting, enhanced intersection treatments and gateway elements.
Phase one will occur on the 700 block of K Street, St. Rose of Lima Park, and the east side of 7th street between K and L streets. The project comprises three key updates, including:
Streetscape enhancements
The 700 block will include new and improved design treatments, including consistent paving materials, street furniture, trash receptacles, landscaping, and lighting.
In ground water feature at the park
St. Rose of Lima Park's turf will be replaced with hardscape paving and will feature an interactive water element.
Regional Transit (RT) platform station relocation
The existing St. Rose of Lima Park light rail station located on 7th and K streets will be relocated to the east side of 7th Street, stretching from just south of the K-L alley to just north of K Street. The station will include a new shelter, lighting and street furniture. The added benefit of this move is to create an urban plaza on 7th Street, while serving the Gold Line trains traveling from the Sacramento Valley Station to Historic Folsom, as well as the Blue Line trains traveling from Watt/I-80 to Meadowview. This relocation project will increase accessibility to and from the K Street Mall and the Downtown Plaza.
Click Phase I K Street (PDF) 1.13Mb to view the Streetscape Renditions.
Construction Timeline (check back soon for updates on the specific construction dates):
- Stage 3: Streetscape Enhancements on the 700 Block of K (North of RT Tracks)
June through December 2009
- Stage 4: Streetscape Enhancements on the 700 Block of K (South of RT Tracks)
August through December 2009
Links
- To obtain information about street and sidewalk closures, visit the
City’s Transportation Department Web site.
- For RT Route and Schedule information, visit RT Routes & Schedules.
- RFP Construction Documentation K Street Streetscape Project.
Contacts
Project questions
Denise Malvetti, (916)808-7064
dmalvetti@cityofsacramento.org
Media inquiries
Maurice Chaney, (916)808-7948
mchaney@cityofsacramento.org
BACK TO TOP
|