Parks and Recreation Home
Parks
Recreation
Park Planning and Development Services

-Master Plan 2005-2010
-Park Plans and Projects

Parks and Recreation Commission
Events and Meetings
How do I....
Newsroom
Parks and Recreation Employment

Jacinto Creek Park Master Plan

8600 W. Stockton Boulevard, adjacent to Irene B. West Elementary School in South Sacramento - Jacinto Creek Park Photo Page - Google Map

Phase 1 and Phase 2 construction

Phase 1

Jacinto Creek Park Master Plan Phase One

Phase One which is 6 acres of this 11-acre community park was completed in May 2006 and includes:

  • A multi-purpose, full-sized soccer/baseball field
  • A tot lot and adventure area playground
  • A group picnic area with shade structure
  • Bikeway connection to Jacinto Creek Parkway
  • Walkways
  • Drinking fountains
  • Site furniture

Jacinto Creek Park Master Plan-Phase 1 PDF file PDF File- this 8" x 10" high quality version of the above graphic requires Adobe Acrobat Reader

Phase 2

Jacinto Creek Park Master Plan Phase Two

Phase Two begins construction in summer 2007 and will be complete in summer 2008. Phase two will consist of the remaining 5 acres of park and will include:

  • Lifetrail Stations (senior and disabled fitness equipment stations) installed during May 2007
  • A dog park
  • A bantam soccer field
  • A restroom
  • Walkways
  • Site landscaping

Jacinto Creek Park Master Plan PDF-Phase 2 PDF file PDF File- this 8" x 10" high quality version of the above graphic requires Adobe Acrobat Reader